124364 Info
: Construct a custom beam by sandwiching 1/2-inch plywood between two treated 2x4s to prevent bowing over time.
: Place at the bottom of the hole for drainage and to help level the post. 124364
: Pour 2-3 inches of gravel into the bottom of the hole before setting the post. : Construct a custom beam by sandwiching 1/2-inch
: Shape the top of the concrete into a slope away from the post to prevent water from pooling at the base and causing rot. 124364
: For maximum strength, premix the concrete in a wheelbarrow before pouring.





News