(e.g., water leaks, efflorescence)? Differences between Adhered and Anchored veneer? Installation Guidelines for Adhered Concrete Masonry Veneer

A space must be created behind the mortar scratch coat to allow for drainage.

) or 18-gauge woven wire mesh is required to meet ASTM standards (C847 or C1032).

Disclaimer: Always prioritize the specific product manufacturer's installation instructions, which may have additional requirements beyond the general MVMA guidelines.

Products should meet ICC-ES Acceptance Criteria 275 (AC275).